Anything that is a fire or shock risk comes first: open splices, hot or burned connections, missing ground-fault protection near water, and damaged or overloaded panels. Then code items, then cosmetic ones. We can go through the report with you.
Anything that is a fire or shock risk comes first: open splices, hot or burned connections, missing ground-fault protection near water, and damaged or overloaded panels. Then code items, then cosmetic ones. We can go through the report with you.
Leave A Comment